Concrete website and engineering checkpoints, with the limitation attached. A change log is not a reliability percentage and an internal candidate is not a public release.
Public product story
Evidence-first website and support system
Made verified outcomes, honest uncertainty and customer self-service the centre of the public VRA experience.
Named VRA Evidence as a primary product capability.
Added a representative interactive farm-run replay and explicit uncertain-outcome example.
Published the 28-article support wiki, seven-day trial explanation and linkable resources.
Added Reliability Lab methodology and a public build-in-progress board.
Website release. This entry does not change automation maturity.
Engineering checkpoint
Terminal-state and navigation qualification
Closed a set of V2 terminal-state, navigation and recovery defects uncovered during one-farm qualification.
Hardened recognition of completed, active, unavailable and uncertain terminal states.
Reconciled navigation after known interruptions instead of reporting a closed menu as success.
Added bounded handling for the recurring Kings Decree dialogue.
Qualified one-farm execution paths and repaired catalogue regressions found during the pass.
Internal qualification evidence; not a public release or fleet-wide reliability claim.
Engineering checkpoint
Reward verification and no-claim states
Improved reward workflows so claimable, already-claimed and animated outcomes are classified separately.
Recognised Mail no-claim terminals across supported categories.
Made Prosperity claim outcomes causal and reduced unnecessary waiting.
Waited for settled chest panels and reward animations before return.
Recorded operator acceptance evidence for the then-tested Prosperity path.
Later validation can demote a workflow when a new game variant fails.
Engineering checkpoint
Recovery paths and building actions
Expanded fail-closed recovery around building invocation, walls, recruitment and exploration.
Added exact building-function recovery paths.
Used current semantic building navigation where available.
Qualified the intact-wall no-action terminal.
Separated free Hero and Skill recruitment from paid controls.
Prevented swallowed promotion-close input from falling through.
Development changes; customer release scope remains governed by current validation.
0.9.57 candidate
Limited unsigned beta candidate prepared
Prepared a customer-profile build, installer/portable artefacts and commercial support surfaces for Windows acceptance.
23 active catalogue actions implemented with bounded reliability contracts.
Customer profile physically separated from development/model-lab modules.
First-run setup, Environment Health, GnBots migration, licensing and support bundle present.
Defender checks and manifest/SBOM gates passed for the frozen artefacts.
Full customer-like Windows acceptance remained incomplete and the build was unsigned. It was not a general public release.
STATUS, NOT SPIN
See what is built, validating or deferred.
The public development board separates architecture, active validation, known limitations and future work.